Salary not disclosed by employer
Job Description
ABOUT US
Bachy Soletanche Singapore is a subsidiary of the world’s foremost geotechnical specialist engineering contractor Soletanche Bachy Group, we have marked our presence in Singapore since the mid-1970s, contributing significantly to the country's infrastructure development. Our group global network spans nearly 60 countries with 80 subsidiaries and branches, allowing us to deliver a comprehensive suite of geotechnical processes and innovative solutions tailored to the unique challenges of each project.
Involved in some of the country’s most outstanding infrastructure and iconic buildings, we have played a significant role to build the foundations of the Smart and Green city that Singapore is globally recognized today.
Our main growth drivers offer the most extensive range of geotechnical solutions available on the market today, including:
• Diaphragm Walls
• Deep Foundation
• Tunnelling
• Grouting
• Piling and Underpinning
• Ground Freezing
ABOUT THE ROLE:
Job Description:
• Manage daily site activities related to E &M works
• SWC site coordination, for SWC Castin item like pipe sleeve, lifting hook & Lifting beam installation & ABS cable pipes laying with cable pit works, light & camera pole installation works
• E&M site coordination works Underground station & Tunnel for earth mat system, Plumbing and sanitary works installation & testing
• Excavation for underground incoming water pipes, Hydrant pipes, M&E site coordination with system wide contractors, and relevant plumbing sanitary precast installation works, subcontractor arranging inspection with RE & RTO inspection
• Coordinate with subcontractor to install Lifting hook & Lifting beam on site as per approved drawing.
• Check construction, CCSM /SEM drawings for accuracy and completeness for construction
• Prior to casting conduct inspection with SWC & RTO
• Coordinate all E&M related work with Civil site engineers
• Procure necessary materials, utilize existing stock, and ensure materials are properly stored for future use
• Liaise with Site engineer to prepare for the upcoming cast in materials
• SWC 1st stage concrete embeds pipes coordination. Tunnel and Cross passage embed pipe coordination.
• Monitoring SWC’s services bracket coordination inside the tunnel and station track side
• Assist Construction Manager for civil works to ensure SWC interface requirements are met and implemented on construction stage and ensure SWC attendance during site inspection request
Job Requirement:
• Degree in Civil Engineering or equivalent
• Minimum 4 years of relevant experience
• Experienced working in tunnel projects
• Able to work in a fast-paced environment
• Pro-active and able to work independently
OTHERS:
• Location: Islandwide (based on project)
• Work Schedule: 5.5 / 6 days